Electric Hand Angle Grinder
-
Price:
Negotiable
- minimum:
- Total supply:
-
Delivery term:
The date of payment from buyers deliver within days
-
seat:
Beijing
-
Validity to:
Long-term effective
-
Last update:
2022-05-20 12:25
-
Browse the number:
265
+
- Contactaixin:
qinna888(Mr.)
- Email: telephone: phone:
-
Arrea:
Beijing
Address:3rd Floor, Building 1, No.200 Binwen Road, Changhe Street, Binjiang District, Hangzhou City. Zhejiang Province, China.
- Website:
+
Products Introduction:
Electric hand angle grinder, also known as a side grinder or disc grinder, is a handheld power tool used for grinding (abrasive cutting) and polishing. Although developed originally as tools for rigid abrasive discs, the availability of an interchangeable power source has encouraged their use with a wide variety of cutters and attachments.
ANGLE GRINDER APPLICATION
Metal contouring, grinding and polishing
Cutting ferrous/non-ferrous metal, stainless steel, tile etc
Grinding and Cutting of Wood/Fiberglass/Plastic etc.
Parameter:
Name: Electric hand angle grinder
Model:AG5030
1.Diameter of wheel;125mm
2.Rated In-put Power:720W
3.No-load Speed: 13000 r/min
4.Rated Voltage:220/110V~
5.Rated Frequency:50/60Hz
Our advantage
1.Powerful motor, full of confidence
Solid materials, durable and reliable
2.Efficient heat dissipation, refuse to burn the machine
Smooth air duct design to achieve three-dimensional heat dissipation of the fuselage
3.A variety of working conditions, one solution
4.Innovation design
5.Excellent Workmanship
6.Accept customized request
7.Competitive factory price
8.High quality
9.Excellent service
Package & Shipping
We usually use standard export packaging.
It is available to provide specific package according to your requirements.
Ningbo/shanghai PORT
Certificates
We can promise the quality, passed the CE certification.
Workshop
FAQ
Q1: Is sample free of charge?
A: Sample fee will be returned in the 1st PO payment .
Q2: How long it takes to ship 1 sample to my country?
A: We have inventory for samples, normally the leadtime is 7 days to arrive at your office.
Q3:Do you have inspection procedures before shipping?
Yes ,we have 100% QC inspection before shipping.
Q4:What is your payment term?
30% deposit, before loading container, the buyer supposed to pay the full balance when the goods ready.
Q5: How about delivery time?
Generally, it will take 30 to 60 days after receiving your advance payment. The specilic delivery time depends on the items and the quantity of your order.
http://www.hzqina.com/