TitleProduct

Plastic Plywood formwork

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Hebei

  • Validity to:

    Long-term effective

  • Last update:

    2020-03-16 12:47

  • Browse the number:

    244

Send an inquiries
+
Hebei Mortmain Rubber and Plastic Technology Co., Ltd
Contactaixin:

mortmain(Mr.)  

Email:

telephone:

phone:

Arrea:

Hebei

Address:

Chen Quan Industrial Zone, Xian County, Cangzhou City, Hebei Province

Website:

http://www.mtmformwork.com/ http://mortmain.gdbaizhong.com/

+

Thickness(mm)

Length*Width(mm)

Weight(kg)

12

1220*2440

22-23

15

1220*2440

26-27

16

1220*2440

28-29

18

1220*2440

32-33


The comparison between plastic formwork and aluminium formwork

1, The aluminum alloy template must be used in standard high rise buildings, in order to reduce the use of costs (construction of a single building below 30 floors is not suggested, only if the phased construction);

2, Every thing must be very accurate whether in the design, or the needs of the owners of the structural drawings and construction drawings if using aluminum alloy template; in addition, size can not be modified; ( while plastic formwrk can be cut according to the need. )

3, One-time investment is high, very expensive.

4, The surface of concrete and aluminum will play a chemical reaction and the plate will not be smooth after several times. small bubbles appear.

5, Aluminum template is not available for the basement construction.

http://www.mtmformwork.com/